Table 2-1
The E5092A performance test procedure
9
10
11
12
13
Test Equipment Required
The test equipment required to perform the entire performance test procedure is listed
below.
Test Equipment:
Network Analyzer
Calibration kit
Chapter 2
Para.
Load Match, Insertion Loss, and Isolation Test for Switch 7
(SPDT, 7COM, 7A and 7B)
Load Match, Insertion Loss, and Isolation Test for Switch 8
(SPDT, 8COM, 8A and 8B)
Load Match, Insertion Loss, and Isolation Test for Switch 9
(SPDT, 9COM, 9A and 9B)
Load Match, Insertion Loss, and Isolation Test for Switch 10
(SPDT, 10COM, 10A and 10B)
Control Line Maximum Current Test
Agilent N5230A Opt. 240 or 245
Agilent 85052D
Performance Tests
Introduction
Title