Converting A Processor Port Network To A Port Network (Mcc); Verifying Hardware - Avaya S8700 Series Manual

Migrating
Hide thumbs Also See for S8700 Series:
Table of Contents

Advertisement

Converting a processor port network to a port network
(MCC)
Note:
This section applies to the S8700 or S8710 Multi-Connect configuration only.
Note:
This section covers the following tasks:
Removing the processor port network control carrier(s)
Installing the expansion control carrier and port carrier
Installing IPSI and maintenance circuit packs
Connecting the CAT5 cables to the IPSI circuit packs
Installing Expansion Interface circuit packs
Postmigration administration

Verifying hardware

Make sure you have the conversion specific hardware on hand. See
Hardware
on page 91 for a list of hardware.
Table 3: Required Migration Hardware 1 of 2
Comcode
J58890-AF-2 L13
NA
700260359
700263502
700276389
108865775
700168727

Converting a processor port network to a port network (MCC)

on page 122
Description
Port network expansion control carrier
CFY1B current limiter (CURL) (if SI,can reuse
existing one if R)
TN2312BP IP Server Interface circuit pack
IPSI adapter
Maintenance cable (attaches to IPSI adapter)
TN775D Maintenance circuit pack
Short ribbon cable—from maintenance board to IPSI
in MCC1 A carrier
on page 92
on page 93
on page 94
on page 94
on page 95
Required Migration
Quantity
1
1
1
1
1
1
1
1 of 2
Issue 4 January 2005
91

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8700S8710

Table of Contents