On active S8710 Media Server
Powering up both media servers
To power up the media servers:
1. Connect the AC power cord to both media servers and to the UPS units to power them up.
2. Push the power button.
3. Place the CD with Communication Manager in the CD-ROM drive on the media server.
The CD must be installed and the media server must boot from the CD. After pressing the
power button on the media server, wait 10 seconds and press the eject button on the CD
tray. The tray opens, insert the CD, and close the tray. Allow the media server to finish
booting.
Accessing the media server
To access the media server:
1. Clear the ARP cache from the laptop if necessary. (See
laptop
on page 141 and return here.)
2. Connect the laptop to the Services port (2) on the back of the media server using a
crossconnect cable.
3. Wait at least 3 minutes after powering up before starting a Telnet session to access the
information on the CD.
On active S8710 Media Server
Clearing the ARP cache on the
Issue 4 January 2005
143