Perform A Template Audit - Avaya Communication Server 1000M Series Upgrade

Meridian 1 51c sg cp piv upgrade
Table of Contents

Advertisement

Table 4
Print site data (Part 3 of 3)
Site data
Print the configured host information
Superloops and XPEs
Note: Items marked with asterisks (*) are required printout for conversion. Other items are
recommended for a total system status.

Perform a template audit

Preparing and planning for the upgrade
A template audit (LD 01) reviews the templates in your system. Corrupted
and duplicate templates are cleaned up. Refer to the following list for an
example of the information generated during the audit.
Note: The template audit may take an extended period of time on large
systems. Run the audit during a low traffic period.
CAUTION — Data Loss
Do not abort this LD until the audit is complete. If the LD is
interrupted, data will be corrupted.
Print command
LD 117
LD 97
REQ
TYPE
SUPL
51C to CS 1000M SG CP PIV Upgrade
Page 33 of 198
PRT HOST (provides
system IP addresses)
CHG
SUPL
Vxxx
V stands for a virtual
superloop and xxx is
the number of the
virtual superloop.
xxx = 0-252 in
multiples of four for
MG 1000E

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs 1000m seriesCs 1000m sgCs 1000m mg

Table of Contents