Avaya Communication Server 1000M Series Upgrade page 107

Meridian 1 51c sg cp piv upgrade
Table of Contents

Advertisement

Figure 27
3PE card connections
Unpack and install the power supply
Connect LAN 1
Procedure 25
Installing the NT6D41CA (DC) or NT8D29BA (AC) power supply
1
Unpack the power supply.
2
Faceplate-disable the power supply.
3
Insert the power supply into the Core/Net module power supply slot.
The LAN 1 port is used to enable redundancy features between the two Core/
Net modules. LAN 1 can also be connected to a local area network (LAN) for
use with LAN based administration tools.
Figure 28 on
page 109
Performing the upgrade
End of Procedure
shows the options for the LAN 1 connections.
51C to CS 1000M SG CP PIV Upgrade
Page 107 of 198