Avaya Communication Server 1000M Series Upgrade page 37

Meridian 1 51c sg cp piv upgrade
Table of Contents

Advertisement

Preparing and planning for the upgrade
If the database is on a 4 MB database media, the 4 Mbyte customer database
must be transferred to 2 MB media.
1
Split the Cores and transfer call processing to Core 0.
2
Install the Database Transfer Utility diskette into the floppy drive.
3
Press the reset button (MAN RST) on the Call Processor card in Core 1
to reboot the system. Start the Database Transfer Utility Tool.
CAUTION — Service Interruption
Select only options:
• <t> Tools Menu from the Install menu, and
• <s> To archive existing database from the Tools menu.
DO NOT select any other options. Other options can
result in operating system corruption.
4
From the installation menu select:
<t>
<s>
<cr> <a>
<cr> <a>
5
The message displays "Database backup complete!" and the Tool menu
appears again after the backup completes correctly.
6
Remove the 2 MB diskette with the customer database from the floppy
drive. Keep the diskette for use after you convert Core 1 to NT4N40 Core/
Net 1. Do not reboot the system at this point.
Go to the Tools menu.
Archive existing database.
Continue with archive (insert blank 2MB diskette
from the software kit into the floppy drive in
Core 1).
Diskette is now in floppy drive in Core 1.
End of Procedure
51C to CS 1000M SG CP PIV Upgrade
Page 37 of 198

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs 1000m seriesCs 1000m sgCs 1000m mg

Table of Contents