Page 24 of 198
Preparing and planning for the upgrade
Avaya Communication Server 1000 task flow
NN43021-459
Standard 05.04
This section provides a high-level task flow for the installation or upgrade of
an Avaya CS 1000 system. The task flow indicates the recommended
sequence of events to follow when configuring a system and provides the
technical document number that contains the detailed procedures required for
the task.
For more information refer to the following technical documents, which are
referenced in Figure 1 on
•
Linux Platform Base and Applications Installation and Commissioning
(NN43001-315)
•
Communication Server 1000M and Meridian 1 Large System
Installation and Commissioning (NN43021-310)
•
CS 1000M and Meridian 1 Large System Upgrades Overview
(NN43021-458)
March 2012
page
25: