e. Verify that the F3100 is securely latched into the chassis by pulling on the latch and
ensuring the device does not move when pulled. Reinstall the device if it is not securely
installed into the chassis.
f. Install each device in the same way the first was installed, and be sure to follow the
installation order depicted in the following figure.
Figure 180: Secure OpenFlex F3100
Note: The blue and yellow LEDs will illuminate followed shortly by the
green LED. All three LEDs will remain illuminated for just over a minute
until the device is initialized. Once the device are initialized, the yellow
and blue LEDs will turn off and the Device Status LED that encircles the
device release button will illuminate indicating that the SPDK services
are running. Wait time is not required between the installation of
multiple OpenFlex F3100 devices.
3. Management
3.2 Part Replacement