Perkins 1106D Disassembly And Assembly page 90

Industrial engine
Table of Contents

Advertisement

90
Disassembly and Assembly Section
Illustration 165
2. If necessary, install Tooling (C) into the hole (Y)
in the cylinder block. Use Tooling (C) in order to
lock the crankshaft in the correct position. Refer
to Testing and Adjusting Manual, "Finding Top
Centre Position for No.1 Piston".
Note: Do not use excessive force to install Tooling
(C). Do not use Tooling (C) to hold the crankshaft
during repairs.
3. Ensure that all of the components of the front gear
group are clean and free from wear of damage. If
necessary, replace any components that are worn
or damaged.
Illustration 166
4. Install the camshaft gear (1). Loosely install the
setscrew (6) and the washer (5) for the camshaft
gear. Refer to Disassembly and Assembly Manual,
"Camshaft Gear - Remove and Install" for more
information.
g01195325
Illustration 167
Typical example
5. Install Tooling (B) through the hole (X) in the
camshaft gear (1) into the front housing.
g01198768
Illustration 168
Typical example
Illustration 169
Alignment of timing marks
SENR9983
g01194629
g01194951
g01194949

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents