Reducing the transmission cycle time when there are stations that have not been added
If there are stations that have not been added to the link, the Tlk time (link addition processing time) and
with this the transmission cycle time will be longer.
With the SYS1 instruction, the link addition waiting time Twt in the above formula can be reduced. Thus,
SYS1 can be used to minimize the increase in the transmission cycle time.
<Programming example of SYS1 instruction>
(SYS1, M PCLK1T0, 100)
Function: Setting SYS1 to change the waiting time for a link to be added to the PC(PLC) link from the
default value of 400 ms to 100 ms.
Keywords: Setting for key word no. 1: PCLK1T0
Permissible range for key word no. 2: 10 to 400 (10 ms to 400 ms)
Note:
If there are any units that have not been added to the link, the setting should not be changed as
long as a longer link transmission cycle time does not cause any problem.
The SYS1 instruction should be executed at the beginning of the program, at the rise of R9014. The
-
same waiting time should be set for all linked PLCs.
The waiting time should be set to a value of at least twice the maximum scan time for any of the PLCs
-
connected to the link.
If a short waiting time has been set, there may be PLCs that cannot be added to the link even if their
-
power supply is on. (The shortest time that can be set is 10 ms.)
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fp-x0 l40mrFp-x0 l60rFp-x0 l30rFp-x0 l60mr

Table of Contents