Chapter 3 - Installing the Array
48
The AC power cords are not a standard configuration. Use only the AC
Note:
power cords supplied with your system.
To connect the AC power cords to the system:
Locate the AC power receptacles at the rear of the system, as shown in the
1.
figure below.
Figure 3.6 AC Power Receptacle Locations
Insert the power connector(s) into the mating power receptacle(s) on the
2.
rear of the Memory Array.
If using the cable management arm, route the power cord(s) according to
3.
the instructions in
page 55.
Connecting Equipment Ground
Connect equipment ground from the equipment rack to the Memory Array only
after installing the system into the equipment rack.
Note:
•
Use appropriately sized wire for your equipment application. Minimum
acceptable wire gauge is 8 AWG.
•
Maintain reliable earthing of rack-mounted equipment. Supply extra
connections other than the direct connections to the branch circuit
(e.g., using power strips).
If ground cable included in accessory kit
Using the 2.5 m (8.20 ft) ground cable supplied with the array, attach the
1.
end of the cable with the lug installed to an appropriate grounding point on
the equipment rack. Use an appropriately sized screw to attach the ground
lug to the equipment rack.
VMA-series Memory Array Installation and Service Guide
A
RAID
B
ADMIN
Power
Supply A
Routing the Cables onto the Cable Management Arm
LOC
Power
Supply B
HP-AM456-9002A Rev 01
on