Sun Microsystems StorEdge S1 Array Installation And Maintenance Manual page 59

Hide thumbs Also See for StorEdge S1 Array:
Table of Contents

Advertisement

6. Slide the retaining ring over the stud.
As shown in
the stud plate.
Facing the Upturned Prongs of the Retaining Ring Away From the Stud Plate
FIGURE 3-5
7. Press the retaining ring towards the bracket, using a 3/16 inch or equivalent nut
driver.
Make sure the stud plate is firmly connected but that it is still able to slide along the
bracket between the two folds.
8. Measure the distance between the front post and the post to which the back end
of each bracket must be attached.
For a Sun StorEdge 72-inch expansion cabinet or Sun Fire expansion cabinet,
I
measure from the front post to the third post from the front of the rack
(
FIGURE 3-6
, make sure the prongs on the retaining ring face away from
FIGURE 3-5
Retaining ring prong
).
Stud plate
Chapter 3 Installing the Sun StorEdge S1 Array
Stud
41

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the StorEdge S1 Array and is the answer not in the manual?

Questions and answers

Table of Contents