ATV 250 Service Manual page 42

Hide thumbs Also See for 250:
Table of Contents

Advertisement

2.Installation
Operate according to reverse procedure of
"Disassembly",and pay attention to followig
points:
(1)Install the fuel tank
(2)Connect
a.Air inlet pipe and hose
b.Supporting pad of air pipe and air rubber pipe
Caution
The convext part on the ring should be foreward
when installing the Supporting pad of air pipe.
(3)Install the bolt, bushing of rubber hood and
washer.
Fastening torque of bolt:10N.m
(4)Install:
a.Upper cover of fuel tank
b.Fuel tank cover
c.Plastic expansion screw assy
d.Screw
e.Bolt and related fasteners and connecting
pieces.
The fastening torque of bolt is 10N.m.
(5)Connect:
.Air hose
( 6 )Install
.Cushion(see "Cushion installation"of this
section)
-36-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents