2 - Description and connection of your router
2.3
Installing your F@st
2.3.1
Powering up
First connect the end of the mains adapter lead, supplied with the equipment, to the PWR
socket on your Residential Gateway,
Connect the adapter to a nearby power outlet,
Switching on,
The
LED will light up first, followed by the four Ethernet LEDs (1 to 4), then these last
four LEDs will be off. The
LEDs should be steady and the
then steadies like the
"Green" when a PPP session has been created.
Note:
It lasts around one minute.
2.3.2
Connecting the ADSL cable
Connect one end of the RJ11/RJ11 cable supplied with the equipment to the
of your Residential Gateway.
Connect the other end of this cable as shown in the Figure 2.3.
F@st™ 2804v2 Reference Manual - 2533329475-A
Page 2-6
TM
2804v2
and Ethernet (which corresponds to the connected interface)
LED blinks during the establishment of the ADSL link,
LED. The
Sagemcom document. Reproduction and disclosure prohibited
LED should be steady and turn from "Red" to
ADSL
socket
Need help?
Do you have a question about the F@ST 2804v2 and is the answer not in the manual?
Questions and answers
the username given to me from stc is not correct or the admin part couldn't accept it