Hot Water Operation Procedures - Reeves G2 series Operation Manual

G2 series decontamination water heater
Hide thumbs Also See for G2 series:
Table of Contents

Advertisement

Operation & Maintenance w/IPB

HOT WATER OPERATION PROCEDURES

All water heaters have a built-in Anti-Scald Protection device factory pre-set at
110°F.
Once the unit has started, perform the following procedures with the temperature control valve open but, in the cold
position.
1. Inspect the system for any water, oil or fuel leaks. If a leak is noted, Turn the Unit OFF Immediately. Be sure that
all damaged parts are replaced and that all mechanical problems have been corrected prior to proceeding.
2. Inspect discharge hoses for kinking, cuts and leaks. If a cut or leak has been detected, Turn the Unit OFF
Immediately. Replace damaged hose and ensure all mechanical problems have been corrected prior to proceeding.
After initial start-up, water will begin to heat in approximately 20 seconds and
will reach maximum temperature in approximately 2-1/2 minutes. During the
initial temperature setting, move the temperature control valve knob in a
counter-clockwise (CCW) direction very slowly, allowing time for the
temperature gauge to register the accurate temperature.
3. If no problems or issues were noted, turn the temperature control valve knob counter-clockwise (CCW) to the
desired temperature.
END OF TASK
Part Number 1006375
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
G2 Series Decontamination Water Heater
NOTE
NOTE
0007-2
0007
DHS SYSTEMS, LLC

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2sG2s-i

Table of Contents