Reeves G2 series Operation Manual page 87

G2 series decontamination water heater
Hide thumbs Also See for G2 series:
Table of Contents

Advertisement

Operation & Maintenance w/IPB
INSTALLATION OF POWER SWITCH (CONT):
c. Raise control panel and keep pressure against the panel while installing the mount bolts.
d. Using a 7/16" open end wrench, install and tighten (4) bolts, (4) lock washers and (4) flat washers.
e. Reinstall water supply connector protective cover, hand tight.
f.
Reinstall (4) cam covers on the fresh water and Decon solution outlets.
g. Reconnect power cord to power supply outlet.
h. Perform operation check on the power switch.
END OF TASK
Part Number: 1006375
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
G2 Series Decontamination Water Heater
0014-21
0014
DHS Systems LLC

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2sG2s-i

Table of Contents