Reeves G2 series Operation Manual page 93

G2 series decontamination water heater
Hide thumbs Also See for G2 series:
Table of Contents

Advertisement

Operation & Maintenance w/IPB
BURNER AIR ADJUSTMENT MAINTENANCE PROCEDURES
INITIAL SETUP:
Tools and Special Tools
General Mechanics Tool Kit
Smoke Spot Tester (If Available)
Materials/Parts
Burner Air Adjustment: The air shutter has been factory preset to the proper
operation between sea level and 2000 feet elevation at standard conditions,
(60°F ambient water, and air temperatures).
In cooler temperatures or higher altitudes, it may be necessary to adjust the air
supply to the combustion chamber. This adjustment will maximize burner
efficient operation or excessive soot buildup on the heat exchanger coil. A
smoke spot test is recommended during any air shutter and band adjustment. If
you do not have the equipment to perform a smoke spot test, follow the
procedures listed below.
BURNER AIR ADJUSTMENT PROCEDURES:
1. The water heater must be operating and heating water.
2. Loosen the locking screw on the air shutter.
3. Check for smoke from the heat exchanger exhaust. If smoke is not present, slowly close the air shutter by
moving the dial counterclockwise (CCW) to a lower number. Continue moving the dial CCW until smoke
appears.
4. Record the setting.
Part Number: 1006375
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
G2 Series Decontamination Water Heater
PROCEDURES REQUIRE VERIFICATION
Personnel Required
One
Equipment Condition
Equipment Powered Down
Power Source Disconnected
NOTE
Figure 1. Burner Air Adjustment.
0015-5
WORK INPROGRESS
DHS Systems LLC
0015

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2sG2s-i

Table of Contents