Reeves G2 series Operation Manual page 82

G2 series decontamination water heater
Hide thumbs Also See for G2 series:
Table of Contents

Advertisement

Operation & Maintenance w/IPB
REMOVE AND REPLACE FUEL TANK ASSEMBLY PROCEDURES
INITIAL SETUP:
Tools and Special Tools
General Mechanics Tool Kit
Materials/Parts
Waste Fuel Container or Equivalent
Rags
REMOVAL OF THE FUEL TANK FOR CONTAMINATED FUEL:
1. Removing the fuel tank:
a. Disconnect the power cord from the power supply outlet.
b. Using a 9/16" open end wrench, loosen and remove the fuel water separator in-line at the fuel tank.
c. Using a 9/16" open end wrench, loosen and remove the fuel pump inlet line at the fuel tank.
d. Loosen and remove (2) bolts, (2) lock washers and (2) flat washers from the fuel tank straps
underneath fuel tank.
e. Loosen and remove (2) nylock nuts, (2) lock washers and (2) flat washers from the fuel tank upper
straps.
f.
Remove fuel tank.
g. Remove fuel cap and drain contaminated fuel into a waste fuel container or equivalent.
INSTALLATION OF THE FUEL TANK ASSEMBLY:
2. Installing the fuel tank:
a. Reinstall empty fuel tank.
b. Reinstall fuel tank straps; install (2) flat washers, (2) lock washers and (2) nylock nuts on the upper
fuel straps.
c. Install (2) bolts, (2) lock washers and (2) flat washers on the fuel tank straps underneath the fuel tank.
d. Using a 9/16" open end wrench, install and tighten the fuel pump inlet line B-nut at the tank.
e. Using a 9/16" open end wrench, install and tighten the fuel water separator in-line B-nut at the tank.
f.
Refill fuel tank using clean No. 1 or No. 2 fuel oil/diesel or kerosene. Do Not Use Gasoline.
g. Reconnect the power cord to the power supply outlet.
h. Perform operation and leak check.
END OF TASK
Part Number: 1006375
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
G2 Series Decontamination Water Heater
PROCEDURES REQUIRE VERIFICATION
Personnel Required
One
Equipment Condition
Equipment Powered Down
Power Source Disconnected
0014-16
0014
DHS Systems LLC

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2sG2s-i

Table of Contents