Reeves G2 series Operation Manual page 94

G2 series decontamination water heater
Hide thumbs Also See for G2 series:
Table of Contents

Advertisement

Operation & Maintenance w/IPB
BURNER AIR ADJUSTMENT MAINTENANCE PROCEDURES (CONT):
5. Open the air shutter by two increments. (Example – if air shutter was set at 2, then move it to 4).
6. Repeat steps 3 - 5 until a smoke puff is noticed.
7. Record the air shutter setting.
8. The difference between the recorded settings in step 4 and step 7 is the combustion window. Set the dial half
way between these settings.
If you are unable to detect a setting on either step 3 or step 5, more or less air may
be needed to achieve a proper combustion window. Loosen the bolt and open the
Air Band in ¼ increments. Repeat steps 3 and step 5 until proper combustion
window is achieved.
END OF TASK
Part Number: 1006375
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
G2 Series Decontamination Water Heater
NOTE
0015-6
0015
DHS Systems LLC

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2sG2s-i

Table of Contents