G2S / G2S-I Equipment Maintenance Procedures - Reeves G2 series Operation Manual

G2 series decontamination water heater
Hide thumbs Also See for G2 series:
Table of Contents

Advertisement

Operation & Maintenance w/IPB
GENERAL
This work package provides information needed by the Operator when performing the following services to the G2S /
G2S-I Decontamination Water Heater. They consist of:
Remove and Replace Burner Motor Assembly Procedures
Burner Air Adjustment Maintenance Procedures
Remove and Replace Fuel Pump/Solenoid Procedures
Remove and Replace Fuel Pump Flexible Coupling Procedures
Remove and Replace Electronic Igniter Assembly Procedures
Remove and Replace Fuel Nozzle and Electrode Assembly Procedures
Remove and Replace Fuel Tank Assembly Procedures
Remove and Replace Fuel Filter/Water Separator Procedures
Inspection and Cleaning Suction Tube Screen Procedures (G2S-I Water Heater ONLY)
Injector Maintenance Procedures (G2S-I Water Heater ONLY)
Remove and Replace Power Switch Procedures
Seasonal Maintenance Procedures
Voltage sources, in addition to being an electrical shock hazard, may also potentially produce
serious burns. Care should be exercised when using water around exposed power connections.
Ensure that all power to the system has been shut off, disconnected and water heater has cooled
off before disassembling and cleaning the components of the G2S / G2S-I Decontamination Water
Heater.
Part Number: 1006375
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
G2 Series Decontamination Water Heater
OPERATOR MAINTENANCE INSTRUCTIONS
G2 SERIES DECONTAMINATION WATER HEATER

G2S / G2S-I EQUIPMENT MAINTENANCE PROCEDURES

WORK INPROGRESS
WARNING
0015-1
0015
DHS Systems LLC

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2sG2s-i

Table of Contents