Reeves G2 series Operation Manual page 86

G2 series decontamination water heater
Hide thumbs Also See for G2 series:
Table of Contents

Advertisement

Operation & Maintenance w/IPB
REMOVE AND REPLACE POWER SWITCH PROCEDURES
INITIAL SETUP:
Tools and Special Tools
General Mechanics Tool Kit
Materials/Parts
REMOVAL OF POWER SWITCH:
1. Removing the Power Switch:
a. Disconnect the power cord from the power supply outlet.
b. Disconnect and remove (4) cam covers on the fresh water and Decon solution outlets.
c. Loosen and remove the water supply connector protective cover.
Keep pressure against the panel so it doesn't drop open when removing the bolts.
d. Using a 7/16" open end wrench, loosen and remove the control panel (4) bolts, (4) lock washers and
(4) flat washers. Carefully lower control panel.
e. Disconnect power switch as follows:
1. Remove white wire #024
2. Remove black wire #013
3. Remove black wire #061
f.
Depress the top and bottom tab on the power switch while pushing the switch outward.
g. Remove switch.
INSTALLATION OF POWER SWITCH:
2. Installing the Power Switch:
a. Insert new power switch into the control panel until it locks into place.
b. Connect the power switch as follows:
1. Install black wire #061.
2. Install black wire #013.
3. Install white wire #024.
Part Number: 1006375
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
G2 Series Decontamination Water Heater
PROCEDURES REQUIRE VERIFICATION
Personnel Required
One
Equipment Condition
Equipment Powered Down
Power Source Disconnected
NOTE
0014-20
0014
DHS Systems LLC

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2sG2s-i

Table of Contents