Installing and Cabling the Displays
5a
Temporarily hang the right display onto the frame rail of the structure using the top hooks. Connect
the power, DVI, and fan cables. TURN THE DISPLAY POWER SWITCH TO THE ON POSITION.
Display top hooks
Page 78
© 2015 Cisco Systems, Inc. All rights reserved.
Frame rail
DVI connector
Fan connector
Power switch
AC connector
74-12597-xx