NEC Express5800 110Ej User Manual page 262

Table of Contents

Advertisement

9-34 Upgrading Your Server
IDE Device
1.
Provide the proper setting for the device.
See the table below for the settings of the devices which can be installed in the device bay.
Device
IDE device
2.
See the section "Preparing for Installation and Removal" described earlier to prepare.
3.
Remove the left side cover and front mask as described earlier in this chapter.
4.
Remove all the cables from the factory-installed CD-ROM and floppy disk drives and the devices installed in
the device bay.
5.
Remove the factory-installed CD-ROM drive with the release tabs on the both sides of the drive pushed.
6.
Secure the device to be installed to the rail with two screws provided with the device.
Setting
Termination resistance: OFF

Advertisement

Table of Contents
loading

Table of Contents