Unpacking The System; Installing Optional Devices - NEC Express5800 110Ej User Manual

Table of Contents

Advertisement

UNPACKING THE SYSTEM

When you receive your system, inspect the shipping containers prior to unpacking. If the shipping boxes are damaged,
note the damage, and if possible, photograph it for reference. After removing the contents of the containers, keep the
cartons and the packing materials. If the contents appear damaged when you unpack the boxes, file a damage claim with
the carrier immediately.

INSTALLING OPTIONAL DEVICES

To install any optional device, see Chapter 9, "Upgrading Your Server," for the installation procedure. Proceed to the
next section if you have no optional devices to install.
IMPORTANT:
available for the server in the markets. However, we recommend that you should only use
products we recommend for stable operation. We assume no liability for data errors and
failures due to malfunction of the server resulted from installation of those third-party
products.
There are third-party products (memory modules, hard disk drives, etc.)
Setting Up Your Server 3-3

Advertisement

Table of Contents
loading

Table of Contents