Display Installation On Top Of 29U Rack - IBM 300 Service Manual

Nways switch administration station
Hide thumbs Also See for 300:
Table of Contents

Advertisement

D
Figure 1-30. Display Installation on Top of 29U Rack
c. ____ Put the display in place (near the front of the machine).
d. ____ Once the display is in place secure it by tightening the screws F .
4. ____ Route the display power and signal cables through the top opening.
5. ____ Reinstall the top cover B (see Figure 1-28 on page 1-23). Be sure that
the signal and power display cables are correctly routed in the top aperture C .
Secure the top cover with the screws A that you previously removed in step 1.
6. ____ Go to "Connecting the NAS in the 29U Rack" on page 1-26.
Installing the NAS and Its Modem
Chapter 1. Installing and Configuring the NAS and Its Modem
F
D
1-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5005012220 nways 3002220 nways 5002220 nways 5016563

Table of Contents