Rack Safety; Rack Installation - IBM SAN48C-6 Installation, Service And User Manual

Table of Contents

Advertisement

• Wear a wrist grounding strap connected to chassis ground (if the switch is plugged in) or a bench
ground
• Store ESD-sensitive components in antistatic packaging

Rack safety

Be sure to follow all safety guidelines when installing the device.

Rack installation

DANGER: Observe the following precautions when working on or around your IT rack system:
• Heavy equipment—personal injury or equipment damage might result if mishandled.
• Always lower the leveling pads on the rack cabinet.
• Always install stabilizer brackets on the rack cabinet.
• To avoid hazardous conditions due to uneven mechanical loading, always install the heaviest
devices in the bottom of the rack cabinet. Always install servers and optional devices starting
from the bottom of the rack cabinet.
• Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on
top of rack-mounted devices.
• Each rack cabinet might have more than one power cord. Be sure to disconnect all power cords
in the rack cabinet when directed to disconnect power during servicing.
• Connect all devices installed in a rack cabinet to power devices installed in the same rack
cabinet. Do not plug a power cord from a device installed in one rack cabinet into a power
device installed in a different rack cabinet.
• An electrical outlet that is not correctly wired could place hazardous voltage on the metal parts
of the system or the devices that attach to the system. It is the responsibility of the customer
to ensure that the outlet is correctly wired and grounded to prevent an electrical shock.
(R001 part 1 of 2)
CAUTION:
• Do not install a unit in a rack where the internal rack ambient temperatures will exceed the
manufacturer's recommended ambient temperature for all your rack-mounted devices.
• Do not install a unit in a rack where the air flow is compromised. Ensure that air flow is not
blocked or reduced on any side, front, or back of a unit used for air flow through the unit.
• Consideration should be given to the connection of the equipment to the supply circuit so that
overloading of the circuits does not compromise the supply wiring or overcurrent protection.
To provide the correct power connection to a rack, refer to the rating labels located on the
equipment in the rack to determine the total power requirement of the supply circuit.
• (For sliding drawers) Do not pull out or install any drawer or feature if the rack stabilizer
brackets are not attached to the rack. Do not pull out more than one drawer at a time. The rack
might become unstable if you pull out more than one drawer at a time.
• (For fixed drawers) This drawer is a fixed drawer and must not be moved for servicing unless
specified by the manufacturer. Attempting to move the drawer partially or completely out of
the rack might cause the rack to become unstable or cause the drawer to fall out of the rack.
(R001 part 2 of 2)
xvi IBM Storage Networking: IBM Storage Networking SAN48C-6 32 Gbps 48-Port Fibre Channel Switch
Installation, Service, and User Guide

Advertisement

Table of Contents
loading

Table of Contents