Download Print this page

Support Installation At The Rear Of A 29U Rack - IBM 300 Service Manual

Nways switch administration station
Hide thumbs

Advertisement

Figure 1-26. Support Installation at the Rear of a 29U Rack
4. ____ From the front of the rack, install the upper plate G (PN 42L2851) into
the rack (see Figure 1-25 on page 1-20). The rear part of the upper plate must
be on the top of the support D previously installed.
5. ____ Secure the upper plate G on the front of the rack with screws E (PN
43G3084), and on the support D with 8-mm M4 screws H (see Figure 1-25
on page 1-20).
6. ____ On the front of the rack, install a retainer J (PN 42L2853) under the
upper plate G using the screws H .
7. ____ From the rear of the rack, push the NAS against the retainer previously
installed. Install two retainers J under the upper plate G in order to maintain
the NAS. Secure them using screws H (see Figure 1-27 on page 1-22).
Installing the NAS and Its Modem
Chapter 1. Installing and Configuring the NAS and Its Modem
1-21

Advertisement

loading

  Related Manuals for IBM 300

This manual is also suitable for:

5005012220 nways 3002220 nways 5002220 nways 5016563