Installing The Retainers To Secure The Nas In A 37U Rack (Earthquake) - IBM 300 Service Manual

Nways switch administration station
Hide thumbs Also See for 300:
Table of Contents

Advertisement

Installing the NAS and Its Modem
6. ____ From the front of the rack, install the upper plate G (PN 42L2851) into
7. ____ Secure the upper plate G on the front of the rack with screws E (PN
8. ____ On the front of the rack, install a retainer J (PN 42L2853) under the
9. ____ From the rear of the rack. Push the NAS against the retainer previously
Figure 1-15. Installing the Retainers to Secure the NAS in a 37U rack (Earthquake)
1-12
2220 Setup and Service Guide
the rack. The rear part of the upper plate must be on the top of the support D
previously installed.
43G3084), and on the support D with 8-mm M4 screws H (see Figure 1-12
on page 1-10).
upper plate G using the screws H .
installed. Install two retainers J under the upper plate G in order to maintain
the NAS. Secure them using screws H (see Figure 1-15).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5005012220 nways 3002220 nways 5002220 nways 5016563

Table of Contents