Installing the NAS in a 37U Rack

1. ____ Unpack the keyboard and the mouse, open the service drawer J , and
Figure 1-4. Keyboard Installation in 37U Rack
2. If you have to install the NAS:
install the keyboard K in the drawer as shown in Figure 1-4. Put the mouse
H on the plate located in front of the keyboard.
K
H
J
v Without the earthquake feature, go to "NAS Installation into a 37U Rack
(Standard)" on page 1-6.
v With the earthquake feature, go to "NAS Installation into a 37U Rack
(Earthquake Feature)" on page 1-7.
Installing the NAS and Its Modem
Chapter 1. Installing and Configuring the NAS and Its Modem
1-5