OIL PAN AND OIL SCREEN
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
Engine Oil Draining and Supplying
l
(Refer to GROUP 00 - Maintenance Service.)
Front Air Dam Removal and Installation <Active Aero>
l
(Refer to GROUP 51 - Aero Parts.)
Under Cover Removal and installation
l
.
.
. . . . w-.
60-70 Nm
Removal steps
1. Left member
2. Starter
3. Transaxle stay (front)
4. Transaxle stay (rear) cFWD>
ENGINE - Oil Pan and Oil Screen
l
l
9 Nm
6 Nm
7 ft.lbs.
TSB Revision
Front Exhaust Pipe Removal and Installation
(Refer to GROUP 15 - Exhaust Pipe and Main Muffler.)
Transfer Assembly Removal and Installation cAWD>
(Refer to GROUP 22 - Transfer Assembly.)
Sealant: MITSUBISHI GENUINE
Part No. MD970389 or equivalent
I
9 Nm
75 Nm
36 Nm
26 ft.lbs.
0 0 0 0 2 1 0 5
5. Bell housing cover
6. Oil return pipes connection <Turbo>
7. Oil pan