Suzuki VZ800 Service Manual page 58

Hide thumbs Also See for VZ800:
Table of Contents

Advertisement

3-12 ENGINE
• Remove the valve inspection caps. (F & R)
• Remove the intake pipes 6. (F & R)
CYLINDER HEAD COVER
• Remove the valve timing inspection plug 1 and the generator
cover cap 2.
• Position "R I T" line on the generator with the center of the
valve timing inspection hole.
• Remove the cylinder head cover. (Rear)
R
T

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vz800k5M50Boulevard m50Intruder vz800

Table of Contents