Verify that you have received all the parts of your server.
Server
■
Rackmount kit
■
Package of mounting screws and nuts in assorted sizes to fit various types of racks
■
and cabinets
Earth grounding lug and two M5 nuts
■
Hardware, cables, documents, and connectors
■
Any optional components that were ordered with the server
■
Related Information
"Handling Precautions" on page 20
■
"ESD Precautions" on page 21
■
"Tools Needed for Installation" on page 22
■
"Optional Components" on page 22
■
"Rack Cautions" on page 23
■
"Stabilize the Rack" on page 24
■
Handling Precautions
Caution – Deploy the antitilt bar on the equipment rack before beginning an
installation.
Caution – The server is heavy. Two people are required to lift and mount this server
into a rack enclosure when using the procedures in this document. See
Specifications" on page
20