Leaf Package Contents; Management Package Contents; Physical Installation - Mellanox Technologies MIS5300 Hardware Installation Manual

324-port infiniband qdr switchx switch platform
Table of Contents

Advertisement

InfiniBand Switch Platform Hardware User Manual
Before you install your new IS5300 series chassis, unpack the system and check to make
sure that all the parts have been sent, check this against the parts list. Check the parts for
visible damage that may have occurred during shipping.
1.4

Leaf Package Contents

The leafs are ordered by the customer and are shipped 4 to a box. The customer will
receive as many boxes as needed to fill the order.
1.5

Management Package Contents

When a second management module is ordered the package includes:
• 1 management module ordered by the customer
• 1 RJ45 to DB9 harness
1.6

Physical Installation

The switch platform uses 18U of rack space in a standard 19" rack, 16U for the chassis
and 2U for the shelf. The switch ships from the factory with mounting holes on the spine
side. There are upper brackets to connect the leaf side to the rack near the top of the chas-
sis, and there are two lock-down bars to secure the chassis to the shelf. The weight of the
switch is supported from underneath the unit by the shelf.
This chassis can be installed in standard 19" racks that have between 65cm and 80cm
between the vertical supports of the rack. Make sure that a fully populated rack including
cables will have sufficient air flow for cooling.
Mellanox Technologies
If anything is damaged or missing, contact your customer representative immediately.
The rack mounting holes conform to the EIA-310 standard for 19-inch racks. Guaran-
tee proper ventilation, by leaving 8cm (3") of space to the front and rear of the switch.
This will ensure proper air flow through the chassis. This is crucial for maintaining
good airflow at ambient temperature. In particular, route cables such that they do not
impede the air into or out of the chassis.
Warning: This equipment is very heavy. Safety is the first concern. Make sure that
adequate manpower and proper equipment is used for transporting and moving the
chassis.
The fully loaded chassis weighs:
212.36 kg (468 LBS) full configuration
90 kg (199 LBS) empty configuration
154kg (339 LBS.) shipped configuration
Choose a rack which is able to support the mechanical and environmental characteris-
tics of a fully populated switch chassis.
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchx is5300 gt series

Table of Contents