Figure 19: Fork Lift; Figure 20: Mechanical Lift - Mellanox Technologies MIS5300 Hardware Installation Manual

324-port infiniband qdr switchx switch platform
Table of Contents

Advertisement

InfiniBand Switch Platform Hardware User Manual
6. Unscrew both lock-down bars.
7. Place the chassis in front of the rack and as close as possible to the rack.
8. Raise the chassis so that it is ~5cm above the shelf in the rack.
9. Raise the hinged extension on the container floor.
10. Lower the chassis until the hinged extension is sitting on the shelf extension.
11. Push the chassis from the container to the shelf.
Mellanox Technologies
With both lock-down bars removed the chassis can roll! Be very careful that the chassis
does not roll off of the pallet.

Figure 19: Fork Lift

Hinged extension

Figure 20: Mechanical Lift

Save the container pallet to remove this chassis. It will be necessary for the removal
and disposal procedures.
Container floor
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchx is5300 gt series

Table of Contents