Figure 13: Putting The Chassis In The Rack Using A Fork Lift - Mellanox Technologies MIS5300 Hardware Installation Manual

324-port infiniband qdr switchx switch platform
Table of Contents

Advertisement

InfiniBand Switch Platform Hardware User Manual
12. Place 8 caged nuts into the vertical rack support at the locations corresponding to the
holes in the chassis faceplate. The holes in the faceplate start at 2U above the shelf
and are spaced every 4U centered as you go up the vertical rack support. There are 4
holes on each side.
1.6.3.6 Inserting the Chassis
1. Put the container on the fork lift.
Mellanox Technologies
The chassis is on ball bearings and can roll easily. Be aware that the chassis can roll off
of the pallet. Should the chassis start to fall, move out of the way. The chassis can
cause grave bodily harm should it fall on or near you.

Figure 13: Putting the Chassis in the Rack Using a Fork Lift

The chassis is screwed down to the pallet on both the spine side and the leaf side.