Figure 44: Intact Vs Defected Middle Signal Connectors; Figure 45: Intact Vs Defected Power Pin Holders - Mellanox Technologies MIS5300 Hardware Installation Manual

324-port infiniband qdr switchx switch platform
Table of Contents

Advertisement

InfiniBand Switch Platform Hardware User Manual
4. Check power connector's integrity. Look for any damage on the power connector
casing or blades damage, or any deviations from the pass criterion shown in
Figure 45.
5. Start with the ejector handles fully open; that is, at 45 degrees to the front panel of the
spine.
6. Holding the spine by its sides, carefully set the spine board into the chassis.
7. Using only the ejector handles, slowly slide the board into the chassis until the hooks
reach the vertical bar.
8. Catch the hooks onto the vertical bar of the chassis and push the ejector handle shut.
Mellanox Technologies

Figure 44: Intact vs Defected Middle Signal Connectors

Pass

Figure 45: Intact vs Defected Power Pin Holders

Pass
Do not use the fan FRU handle to insert the spine board.
Do not apply excessive force to slide in the spine board. If you feel resistance, remove
the spine and double check both the chassis and spine for any damage.
Fail
Fail
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchx is5300 gt series

Table of Contents