Protocols And Standards; Rrpp Configuration Task List - H3C S7500E Series Operation Manual

S7500e series
Hide thumbs Also See for H3C S7500E Series:
Table of Contents

Advertisement

Operation Manual – RRPP
H3C S7500E Series Ethernet Switches

1.1.5 Protocols and Standards

Related standard: RFC 3619.

1.2 RRPP Configuration Task List

Complete the following tasks to configure RRPP
Configuring Master Node
Configuring Transit Node
Configuring Edge Node
Configuring Assistant Edge Node
Caution:
It is recommended to configure the primary ring first and then the subring when you
configure an RRPP domain. Moreover, a Ring ID cannot be applied to more than
one RRPP ring in one RRPP domain.
If a device lies on multiple RRPP rings in an RRPP domain, only one primary ring
exists. The device serves as either an edge node or an assistant edge node on the
subrings.
The total number of rings configured on a device in all RRPP domains should not be
greater than 16.
Modification of node mode, port role and ring level of an RRPP ring is prohibited
after configuration. If needed, you must first delete the existing configuration.
The ports accessing an RRPP ring must conform to the following conditions:
Trunk port;
Layer 2 Ethernet port or layer 2 GE port;
Except for aggregation port and loopback port;
Port with STP, 802.1x, MAC address authentication, voice VLAN disabled;
Do not enable OAM remote loopback function on an RRPP port. Otherwise, this
may cause temporary broadcast storm;
Enable link status rapid report function on a port accessing an RRPP ring (the
link-delay of the port is set to 0) to accelerate topology convergence.
Task
1-8
Chapter 1 RRPP Configuration
Description
Required
Optional
Optional
Optional

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S7502eS7503eS7506eS7510eS7506e-v

Table of Contents