Figure 4-3. Ups Cabinet Wire Entry Plate And Knockout Locations - Eaton Powerware Series Mechanical Installation Manual

Field installed upm
Hide thumbs Also See for Powerware Series:
Table of Contents

Advertisement

FIELD INSTALLED UPM INSTALLATION
4−4
EATON 9395 Field Installed UPM Mechanical Installation Manual
7.
Locate the small flat bracket and screws from the hardware kit. Align the holes in
the small flat bracket over holes in the top of the FI−UPM and UPS cabinets.
Secure the bracket with the screws from the hardware kit.
8.
Reinstall the FI−UPM front panel removed in Step 6, and secure with the retained
hardware.
9.
If permanently mounting the system, proceed to Step 10; otherwise, continue to
Step 12.
10. Using the retained hardware, reinstall the left shipping bracket removed in
paragraph 4.2, Step 2 on page 4−1 to the left side of the FI−UPM cabinet with
the angle facing outward (see Figure 4-1 on page 4−2).
11. Secure the cabinet to the floor with customer−supplied hardware.
12. Proceed to paragraph 4.4.
LEFT SIDE VIEW

Figure 4-3. UPS Cabinet Wire Entry Plate and Knockout Locations

UPS Front
S
164201717 Rev 3 www.eaton.com/powerquality
Wire entry knockout. Remove knockout to
route wires between cabinets. (Install nylon
grommet after removal of knockout.)
Wire Entry Plate Remove plate to
route wires between cabinets.

Advertisement

Table of Contents
loading

This manual is also suitable for:

9395

Table of Contents