Standard Operations; Power On Control - Fujitsu Eternus DX60 User Manual

Disk storage system
Hide thumbs Also See for Eternus DX60:
Table of Contents

Advertisement

Chapter 3
This chapter explains the procedures for turning the device on and off, attaching and removing
the front or flange cover, turning on the AUTO POWER switch, and wearing a wrist strap.
3.1

Power ON Control

This section explains how to turn the power on.
IMPORTANT
P3AM-3042-06ENZ0
ETERNUS DX60/DX80/DX90 Disk storage system User Guide

Standard Operations

After turning the power on, it takes about 3 minutes for the device to
become READY (i.e. the READY LED turns on). If an error is detected
during the initial power-on diagnostic phase, a longer time (up to ten
minutes) may be required before the READY LED turns on.
Before turning the server on, check that the device, Fibre Channel
switch, and Fibre Channel hub are all READY. If the server is turned on
while any of these devices are not READY, the server may not be able to
recognize the device.
When the AUTO POWER switch of the controller enclosure is turned to
"ON", supplying power to the ETERNUS DX60/DX80/DX90 will cause
the ETERNUS DX60/DX80/DX90 to turn on automatically in cases such
as when the power cord is connected or the power is recovered after
power failure.
When turning on the ETERNUS DX60/DX80/DX90 for the first time,
volume formatting operation, which is set as factory default, may be
performed. However, the ETERNUS DX60/DX80/DX90 setting operation
can be continued.
When canceling a volume format, delete the volume. For details on how
to delete volume, refer to "ETERNUS DX60/DX80/DX90 Web GUI User
Guide".
72
Copyright 2010 FUJITSU LIMITED

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx80Eternus dx90

Table of Contents