Fujitsu Eternus DX60 User Manual page 101

Disk storage system
Hide thumbs Also See for Eternus DX60:
Table of Contents

Advertisement

Chapter 5 Installation
>
5.2 Rack Installation
4
5
5-1
P3AM-3042-06ENZ0
ETERNUS DX60/DX80/DX90 Disk storage system User Guide
The four M6 screw positions for the brackets are determined relative to the AC outlet box
base line.
The M6 screws should be inserted in the 1st and 3rd holes above the base line.
(Rear rack pillars)
[Left]
3rd position
(M6 screws)
1U
AC outlet box
1st position
(M6 screws)
Base line of
AC outlet box
Install the AC outlet box in the rack.
Fasten the AC outlet box to the bracket with the two M3 screws removed in
M3 screw
(Rear rack pillars)
M3 screw
Attach the blank panel to the front side of the rack.
The blank panel should be attached at the same height as the AC outlet box.
Attach the M5 cage nuts or M5 rack nuts to the front rack pillar.
-
Attachment positions
On either side, insert two M5 cage nuts or M5 rack nuts in the 2nd holes above the
blank panel base line.
[Left]
M5 cage nut or
M5 rack nut
1U
2nd position
[Right]
3rd position
(M6 screws)
1st position
(M6 screws)
Brackets
Use the M5 cage nuts if the rack pillar holes are square.
Use the M5 rack nuts if the rack pillar holes are round.
(Rear rack pillars)
[Right]
Blank panel
Base line of
AC outlet box
101
Step
M5 cage nut or
M5 rack nut
2nd position
Copyright 2010 FUJITSU LIMITED
2.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx80Eternus dx90

Table of Contents