Testing The Switch-To-Adjunct Link - Avaya G700 Installing Manual

Media gateway and media server
Hide thumbs Also See for G700:
Table of Contents

Advertisement

Telephones and adjunct systems

Testing the switch-to-adjunct link

You can use the test, status, busyout and release commands to find and correct problems with
CDR links. For more information about these commands, see Maintenance Commands for
Avaya Communication Manager 3.0, Media Gateways and Servers, 03-300431.
status cdr-link
Maintenance Busy? no
Work with the vendor to test the link from the call accounting adjunct.
If a link does not come up immediately, use the busyout cdr-link and release cdr-link
commands to bring up the link.
Additional administration procedures for CDR equipment are provided in the Administrator
Guide for Avaya Communication Manager, 03-300509.
416 Installing and Upgrading the Avaya G700 Media Gateway and Avaya S8300 Media Server
Primary
Link State: up
CDR LINK STATUS
Secondary
extension not administered

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8300

Table of Contents