Power Off A Partition By Scheduled Operation; Relation Of Scheduled Operation And Power Restoration Function; Scheduled Operation Support Conditions; Table 9.5 Relationship Between Scheduled Operation And Partition Power Restoration Mode - Fujitsu PRIMEQUEST 2000 Series Administration Manual

Primequest 2000 series
Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

CHAPTER 9 Chapter System Startup/Shutdown and Power Control
9.3 Scheduled operations
-
Time till the instruction reaches the operating system from the MMB
-
Time until the operating system shutdown is started and time until the start of the operating system
shutdown is notified to the MMB
-
Even if the [Power on Delay] is set to 0 seconds, it may take 30 ~ 70 seconds from the time of turning on
the power and starting, up to reset.
For the scheduled setting, see '1.3.2 [Schedule] menu' in "PRIMEQUEST 2000 series Tool Reference"
(C122-E177).

9.3.2 Power off a Partition by scheduled operation

When a scheduled operation is set for a partition set, power is turned off at the set time.
A daily, weekly, monthly, specific date or a combination of these options can be set a schedule.
For the details on schedule settings, see '1.3.2 [Schedule] menu' in "PRIMEQUEST 2000 series Tool
Reference" (C122-E177).

9.3.3 Relation of scheduled operation and power restoration function

In the PRIMEQUEST 2000 series, scheduled operation and power restoration function are linked when power
restoration mode is set to "Schedule Sync".

TABLE 9.5 Relationship between scheduled operation and partition power restoration mode

No.
When there is power
failure
1
Outside the operation
time
2
Within the operation
time
3
Outside the operation
time
4
Within the operation
time
ON: Partition Power On, OFF: Partition Power Off
Notes
Operations indicated by (*1) in the table, assume normal shutdown when a power failure occurs. If there is an
abnormal power off because the UPS had not been used, the partition will not automatically start (= OFF
mode operation) in a restoration operation, irrespective of the operation settings.

9.3.4 Scheduled operation support conditions

The description of power on/off items, scheduled operation support conditions and menu items are listed in
the table below.
Menu Item
All Partition Power On
All Partition Power Off
Partition Power On
Partition Power Off
Partition Force Power Off
Power Cycle
When the power is
restored
Within the operation
time
Within the operation
time
Outside the operation
time
Outside the operation
time

TABLE 9.6 Power on/off

Scheduled
operations
Not supported
Not supported
Supported
Supported
Not supported
Not supported
Always OFF
Always ON
(*1)
(*1)
OFF
ON
OFF
ON
OFF
ON
OFF
ON
Description
Powers on all partitions.
Powers off all the partitions which are in powered
on, following an operating system shutdown.
Powers on any partition.
Powers off any partition following an operating
system shutdown.
Forcibly powers off any partition without an
operating system shutdown. This is used, to forcibly
power off a partition, when the shutdown from the
operating system is disabled.
Powers off and then powers on any partition. The
partition is forcibly powered off without an operating
system shutdown.
202
Restore (*1)
Schedule
Sync
(*1)
OFF
ON
ON
ON
OFF
OFF
ON
OFF
C122-E175-02EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 2400ePrimequest 2800ePrimequest 2800b

Table of Contents