CHAPTER 9 Chapter System Startup/Shutdown and Power Control

9.1 Power On and Power Off the Whole System

CHAPTER 9
Startup/Shutdown and Power Control
This section describes the startup, shutdown and the power control in PRIMEQUEST 2000 series.
9.1
Power On and Power Off the Whole System
This section describes the power on and power off operations which are supported by the system.
The power control of the whole system is operated from the [System Power Control] window of the MMB.
For details on the [System Power Control] window, see "1.2.8 [System Power Control] window in
"PRIMEQUEST 2000 series Tool Reference" (C122-E177)
9.2

Partition Power on and Power off

This section describes various procedures of power on and Power off for the partition and explains the
method of checking power supply.

9.2.1 Various Methods for Powering On the Partition

There are three methods for powering on the partition, which are as follows.
1. Operation through the MMB Web-UI or MMB CLI.
The partition can be powered on through the MMB Web-U or MMB CLI operation. In this method, power
on can be specified for all the partitions or specified in the partition unit.
2. Scheduled operation (Automatic operation according to a set schedule)
A partition can be powered on by a scheduled operation (Automatic operation function). A partition unit
can be powered on automatically by recording the time of power on in advance by the scheduled
operation function.
Chapter System
[System
FIGURE 9.1
Power Control
195