Fujitsu PRIMEQUEST 2000 Series Administration Manual page 198

Primequest 2000 series
Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

CHAPTER 7 PCI Express card Hot Maintenance in Windows
7.3 NIC Hot Plugging
This section describes the hot plugging procedure for a NIC incorporated into teaming.
Note
-
Be sure to perform hot plugging after removing the card. If the card is not removed, the operating system
may stop.
-
There are some precautions on teaming with Intel PROSet(R). For details on the precautions, see
NIC (Network Interface
1. Confirm physical location, segment number and bus number of NIC to be replaced.
Confirm the physical location, segment number and bus number with step 1 at
procedure' in
Note
In case of multi-function card, there are some cards that have same segment number, same bus number,
and different function numbers.
In this case, please perform step.2 to step.7 of follows respectively.
2. Confirm target NIC in Device Manager.
Confirm NIC with step 2-a at
PCI Express
3. Select the interface in Device Manager, and open Properties.
4. Click the [Teaming] tab, uncheck the [Team this adapter with other adapters] check box, and click the
[OK] button.
Card)'.
'7.2 Common Hot Plugging Procedure for PCI Express
'7.2.1 Replacement
cards'.
procedure' in
'7.2 Common Hot Plugging Procedure for
174
'7.2.1 Replacement
cards'.
C122-E175-02EN
'G.8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 2400ePrimequest 2800ePrimequest 2800b

Table of Contents