Check Shift Solenoid Valve 5 (Ssv5) Power Supply - Chery Tiggo 2009 Service Manual

Chery tiggo 2009 service manual
Table of Contents

Advertisement

4.

CHECK SHIFT SOLENOID VALVE 5 (SSV5) POWER SUPPLY

• Turn the ignition switch on.
• Check power supply between SSV5 E-037 terminal
B5 and ground in the A/T assembly connector
E-037.
• Battery voltage should exist.
• Or using the appropriate diagnostic test tool and a digital multimeter perform the following:
• Check the EVS5 solenoid supply voltage between TCM pin 1 and TCM pin 13 when activating the EVS5 sole-
noid and deactivating the EVS5 solenoid.
• Check the shift solenoid control signal. Check the voltage of the shift solenoid in each shift position.
• Check the voltage of the EVS5 solenoid supply circuit between the transaxle assembly electrical connector pin
B3 and pin B5.
LEVER
EVS1
POSITION
1 - 10
R
0 V
N/P
0 V
1
0 V
2
0 V
3
0 V
4
+12 V
Is the check result normal?
Yes
>>
Go to the next step.
No
>>
Repair or replace the open circuit or short to ground in harness or connectors.
Chery Automobile Co., Ltd.
DIAGNOSIS & TESTING
SEQUENCE SOLENOID (EVS) CONDITION
TCM TERMINAL
EVS2
EVS3
1 - 9
1 - 7
0 V
0 V
0 V
+12 V
0 V
+12 V
+12 V
0 V
0 V
0 V
+12 V
0 V
EVS4
EVS5
1 - 8
1 - 13
0 V
0 V
0 V
0 V
+12 V
0 V
+12 V
0 V
0 V
0 V
0 V
0 V
LTSMD080043
08
EVS6
1 - 14
0 V
0 V
0 V
0
0 V
0 V
85
08–

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents