Chery Tiggo 2009 Service Manual page 779

Chery tiggo 2009 service manual
Table of Contents

Advertisement

Diagnostic Procedure
1.
CHECK GROUND CONNECTION
• Turn ignition switch off.
• Loosen and retighten ground screws on the body (See Ground Inspection in Section 03 Electronic Engine Con-
trols).
• Inspect the ground connection E-208 (See Vehicle Wiring Harness Layout - Engine Room Harness (With Mit-
subishi 2.4L Engine) in Section 16 Wiring).
Is the ground connections OK?
Yes
>>
Go to the next step.
No
>>
Repair or replace ground connection.
2.
CHECK ENGINE COOLANT TEMPERATURE (ECT) SENSOR ELECTRICAL CONNECTOR
• Disconnect the ECT (1) electrical connector.
• Inspect the electrical connector for damage.
Is the electrical connector OK?
Yes
>>
Go to the next step.
No
>>
Repair or replace the electrical connector
as necessary.
Chery Automobile Co., Ltd.
DIAGNOSIS & TESTING
03
LTSM030007
495
03–

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents