This section describes installation of NEC Express5800/ft series.

Tower Model

IMPORTANT:
NEC Express5800/ft series is a precision instrument. You should ask
maintenance personnel to install it.
Select a suitable site for tower model.
Observe the following instructions to use the equipment safely. Failure to follow
these instructions could cause a burn, injury, or damage to physical assets. For
details, see "NOTES FOR SAFE HANDLING" in Chapter 1.
Close enough to connect the
mouse and the display.
Floor or a level
and robust desk or
table
Clean and tidy room
Place having a space enough to fully open
the front bezel (The front bezel extrudes
about 50 mm from the right side of the
server when fully opened.)
Remove all modules before moving the equipment.
Do not install the equipment in non-designated places.
CAUTION
UPS to prevent momentary voltage drop due to power
failure or lightning *
* Optional.
UPS is recommended for best use of
features of ft server.
* It is recommendable to use the server in a room where
temperature can be kept between 15 and 25ºC.
Room that can maintain the following
conditions during operation:
Temperature: 10 to 35ºC
Humidity: 20 to 80% (non-condensing)
100V
120 V or 200V - 240
V parallel bi-polar power
outlet with grounding
Wall outlet within the
reach of supplied power
cord.