Replacing A Summitstack Or Summitstack-V80 Stacking Module - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x460 series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Replacing a SummitStack or SummitStack-V80
Stacking Module
The replacement process is the same for either a SummitStack or a SummitStack-V80 stacking module in
a Summit X460 series switch. You need the following tools to replace a stacking module:
ESD-preventive wrist strap
Screwdriver
To replace a stacking module:
1 Attach an ESD-preventive wrist strap to your wrist and connect the metal end to an appropriate
ground point on the rack.
2 Completely loosen the captive retaining screws and slide the installed stacking module out of the
switch
(Figure
223).
Figure 223: Removing a SummitStack Module
3 Carefully slide the replacement module into the switch
4 Align and tighten the captive retaining screws.
Figure 224: Installing a SummitStack Module
Summit Family Switches Hardware Installation Guide
SH_218
(Figure
224).
SH_217
267

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents