Front-Mounting A Switch In A Two-Post Rack - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x460 series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Installing Summit Family Switches
6 Secure the mounting bracket flanges to the rack, using screws that are appropriate for the rack.
(Rack-mounting screws are not provided.)
The Summit X460 series switch is shipped without installed power supplies. You can install one or two
power supplies. After the switch is secured to the rack, install the necessary power supplies for your
configuration. For instructions, see the following pages:
300 W AC power
supply—page 176
750 W AC power
supply—page 178
300 W DC power
supply—page 181
To install an XGM3-2sf port card, see
To install a stacking module, see

Front-Mounting a Switch in a Two-Post Rack

To front-mount a Summit X460 series switch in a two-post rack:
1 Attach an ESD-preventive wrist strap to your bare wrist and connect the metal end to an appropriate
ground point on the rack.
2 Attach each mounting bracket as follows:
a Set the bracket against the switch housing, with the flange even with the front panel of the switch
(see
Figure
129).
b Use six of the provided screws to secure the bracket to the switch housing.
c Repeat steps
a
and
Figure 129: Attaching a Rack-mounting Flange
3 Slide the switch into the equipment rack
174
page
244.
page
247.
b
to attach the other bracket to the other side of the switch.
(Figure
SH_199
130).
Summit Family Switches Hardware Installation Guide