Extreme Networks Summit X150 Series Hardware Installation Manual page 7

Summit x150 series summit x250e series summit x350 series summit x450 series summit x450a series summit x450e series summit x460 series summit x480 series summit x650 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Installing the Switch in a Cabinet or Four-Post Rack ....................................................................................207
Installing Summit X650 Power Supplies...............................................................................................................209
AC Power Supply Cords ...............................................................................................................................209
Installing a Summit X650 AC Power Supply .................................................................................................209
Installing a Summit X650 DC Power Supply .................................................................................................211
Required Tools and Materials ................................................................................................................211
Preparing the Cables .............................................................................................................................212
Installing the Power Supply....................................................................................................................212
Connecting the Ground Cable ...............................................................................................................214
Connecting the PSU to the DC Source Voltage.....................................................................................214
Connecting Network Interface Cables ..................................................................................................................216
Initial Management Access ..................................................................................................................................217
Connecting Equipment to the Console Port ..................................................................................................217
Logging In for the First Time .........................................................................................................................217
Chapter 7: Installing Summit External Power Supplies......................................................................219
Safety ...................................................................................................................................................................219
Pre-installation Requirements ..............................................................................................................................220
Installing an EPS-160 External Power Module (with EPS-T) ...............................................................................221
Rack-Mounting the EPS-T ............................................................................................................................221
Installing an EPS-160 Power Supply into an EPS-T .....................................................................................221
Connecting the EPS-160 Power Supply to the Switch ..................................................................................222
Installing an EPS-LD External Power Supply .......................................................................................................224
Rack-mounting the EPS-LD Power Supply ...................................................................................................224
Connecting the EPS-LD to the Switch ..........................................................................................................225
Connecting the EPS-LD to Power .................................................................................................................226
Installing an EPS-500 External Power Supply Unit ..............................................................................................227
Rack-mounting an EPS-500 Power Supply...................................................................................................227
Connecting the EPS-500 Power Supply .......................................................................................................228
Installing an EPS-150DC External Power Module (with EPS-T2) ........................................................................230
Rack-mounting the EPS-T2 ..........................................................................................................................230
Installing an EPS-150DC Power Supply .......................................................................................................231
Connecting the DC Wiring Harness to the DC Source Voltage .............................................................231
Installing an EPS-150DC Unit into an EPS-T2 ......................................................................................232
Connecting the EPS-150DC to a Switch................................................................................................233
Installing an EPS-600LS External Power Module ................................................................................................235
Installing an EPS-C Chassis .........................................................................................................................235
Installing an EPS-600LS Power Supply ........................................................................................................237
Chapter 8: Installing Optional Ports .....................................................................................................241
Overview ..............................................................................................................................................................241
Installing a Summit Port Option Card ...................................................................................................................242
Installing XGM and XGM2 Series Port Option Cards....................................................................................242
Installing a Summit XGM3-2sf Port Option Card...........................................................................................244
Installing a VIM2 Module in a Summit X480 Series Switch ..................................................................................245
Installing a Stacking Module in a Summit X460 Series Switch.............................................................................247
PART 3: MAINTENANCE PROCEDURES
Removing an AC-Powered Summit Switch from a Rack (Models Other than Summit X460, X480, and X650 Series)
252
Removing a Summit DC-Powered Switch from a Rack........................................................................................252
Removing an EPS-160 Power Supply from an EPS-T .........................................................................................253
Summit Family Switches Hardware Installation Guide
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents